METHOD

A Structured Industrial Project System

Manucon works on the investor’s side in one of three service models: EPC–Turnkey, EPCM–Turnkey or Employer’s Representative. Whichever model is chosen, the work follows the same five stages, from the first idea to the first production run.

Each stage answers one simple question. The stages overlap: a decision in one stage informs the others, and the plan is updated as the project develops.

Our team is trained in FIDIC Silver Book contracts for EPC-Turnkey projects
and manages delivery within this framework.

OPERATIONAL ALIGNMENT

CLEAR AUTHORITY

CONTROLLED INFORMATION

TRACEABLE DECISIONS

01
Operations

What must the facility do?

We start from the production: processes, machines, material flows, people, logistics, future growth and operating conditions. These become the brief for the design.

Operational requirements

Capacity and flow plan

Performance targets

OUTPUT

Operational Brief & Project Control Framework

Five connected stages; Operations highlighted: processes, machines, material flows, people
02
Design & Engineering

How should it be designed and engineered?

The brief becomes architecture, layout, structure, building services and infrastructure, designed together so that every system fits.

Coordinated design drawings

Technical specifications

Clear interfaces between disciplines

OUTPUT

Coordinated Design Package

Five connected stages; Design & Engineering highlighted: architecture, structure, building services, infrastructure
03
Procurement

What do we buy, from whom, when and on what terms?

The design is split into clear work and equipment packages. Specifications, supplier options, offers, delivery times and logistics are compared, and suppliers are selected.

Package scopes

Offer comparisons

Purchasing schedule

OUTPUT

Procurement & Contracting Strategy

Five connected stages; Procurement highlighted: work packages, suppliers, offers, delivery times
04
Construction

How is it built, and is it built right?

Site works are coordinated and checked against the design, programme, cost and quality targets. Site questions, changes and records are handled according to the service model.

Site and progress reports

Coordination decisions

Quality and control records

OUTPUT

Controlled Site Execution

Five connected stages; Construction highlighted: site works, programme, cost, quality
05
Handover

Is it tested and ready to produce?

Systems are tested and commissioned up to the first production run. Documents are closed, training and operation and maintenance information are handed over, and the facility is accepted.

Test and commissioning records

Acceptance and handover documents

Operation and maintenance handover

OUTPUT

Operational Handover

Five connected stages; Handover highlighted: testing, commissioning, documents, training

OPERATIONS

DESIGN & ENGINEERING

PROCUREMENT

CONSTRUCTION

HANDOVER

OPERATIONAL PERFORMANCE

INTEGRATED OUTCOME

Five stages. One coordinated system.

The method does not add layers for their own sake. It makes information, decisions, responsibilities and approvals visible from the first operational brief to handover.

Method

A Structured Industrial Project System

Manucon works on the investor’s side in one of three service models: EPC–Turnkey, EPCM–Turnkey or Employer’s Representative. Whichever model is chosen, the work follows the same five stages, from the first idea to the first production run.

Each stage answers one simple question. The stages overlap: a decision in one stage informs the others, and the plan is updated as the project develops.

Our team is trained in FIDIC Silver Book contracts for EPC-Turnkey projects
and manages delivery within this framework.

OPERATIONAL ALIGNMENT

CLEAR AUTHORITY

CONTROLLED INFORMATION

TRACEABLE DECISIONS

01
Operations

Operational requirements

Capacity and flow plan

Performance targets

OUTPUT

Operational Brief & Project Control Framework

What must the facility do?

We start from the production: processes, machines, material flows, people, logistics, future growth and operating conditions. These become the brief for the design.

Five connected stages; Operations highlighted: processes, machines, material flows, people
02
Design & Engineering

Coordinated design drawings

Technical specifications

Clear interfaces between disciplines

OUTPUT

Coordinated Design Package

How should it be designed and engineered?

The brief becomes architecture, layout, structure, building services and infrastructure, designed together so that every system fits.

Five connected stages; Design & Engineering highlighted: architecture, structure, building services, infrastructure
03
Procurement

Package scopes

Offer comparisons

Purchasing schedule

OUTPUT

Procurement & Contracting Strategy

What do we buy, from whom, when and on what terms?

The design is split into clear work and equipment packages. Specifications, supplier options, offers, delivery times and logistics are compared, and suppliers are selected.

Five connected stages; Procurement highlighted: work packages, suppliers, offers, delivery times
04
Construction

Site and progress reports

Coordination decisions

Quality and control records

OUTPUT

Controlled Site Execution

How is it built, and is it built right?

Site works are coordinated and checked against the design, programme, cost and quality targets. Site questions, changes and records are handled according to the service model.

Five connected stages; Construction highlighted: site works, programme, cost, quality
05
Handover

Test and commissioning records

Acceptance and handover documents

Operation and maintenance handover

OUTPUT

Operational Handover

Is it tested and ready to produce?

Systems are tested and commissioned up to the first production run. Documents are closed, training and operation and maintenance information are handed over, and the facility is accepted.

Five connected stages; Handover highlighted: testing, commissioning, documents, training

OPERATIONS

DESIGN & ENGINEERING

PROCUREMENT

CONSTRUCTION

HANDOVER

OPERATIONAL PERFORMANCE

INTEGRATED OUTCOME

Five stages. One coordinated system.

The method does not add layers for their own sake. It makes information, decisions, responsibilities and approvals visible from the first operational brief to handover.

METHOD

A Structured Industrial Project System

Manucon works on the investor’s side in one of three service models: EPC–Turnkey, EPCM–Turnkey or Employer’s Representative. Whichever model is chosen, the work follows the same five stages, from the first idea to the first production run.

Each stage answers one simple question. The stages overlap: a decision in one stage informs the others, and the plan is updated as the project develops.

Our team is trained in FIDIC Silver Book contracts for EPC-Turnkey projects
and manages delivery within this framework.

CLEAR AUTHORITY

CONTROLLED INFORMATION

TRACEABLE DECISIONS

OPERATIONAL ALIGNMENT

01
Operations

Operational requirements

Capacity and flow plan

Performance targets

OUTPUT

Operational Brief & Project Control Framework

What must the facility do?

We start from the production: processes, machines, material flows, people, logistics, future growth and operating conditions. These become the brief for the design.

Five connected stages; Operations highlighted: processes, machines, material flows, people
02
Design & Engineering

Coordinated design drawings

Technical specifications

Clear interfaces between disciplines

OUTPUT

Coordinated Design Package

How should it be designed and engineered?

The brief becomes architecture, layout, structure, building services and infrastructure, designed together so that every system fits.

Five connected stages; Design & Engineering highlighted: architecture, structure, building services, infrastructure
03
Procurement

Package scopes

Offer comparisons

Purchasing schedule

OUTPUT

Procurement & Contracting Strategy

What do we buy, from whom, when and on what terms?

The design is split into clear work and equipment packages. Specifications, supplier options, offers, delivery times and logistics are compared, and suppliers are selected.

Five connected stages; Procurement highlighted: work packages, suppliers, offers, delivery times
04
Construction

Site and progress reports

Coordination decisions

Quality and control records

OUTPUT

Controlled Site Execution

How is it built, and is it built right?

Site works are coordinated and checked against the design, programme, cost and quality targets. Site questions, changes and records are handled according to the service model.

Five connected stages; Construction highlighted: site works, programme, cost, quality
05
Handover

Test and commissioning records

Acceptance and handover documents

Operation and maintenance handover

OUTPUT

Operational Handover

Is it tested and ready to produce?

Systems are tested and commissioned up to the first production run. Documents are closed, training and operation and maintenance information are handed over, and the facility is accepted.

Five connected stages; Handover highlighted: testing, commissioning, documents, training

OPERATIONS

DESIGN & ENGINEERING

PROCUREMENT

CONSTRUCTION

HANDOVER

OPERATIONAL PERFORMANCE

INTEGRATED OUTCOME

Five stages. One coordinated system.

The method does not add layers for their own sake. It makes information, decisions, responsibilities and approvals visible from the first operational brief to handover.

MANUCON · Industrial project partner

Ankara, Türkiye

Clear authority. Controlled delivery.

© 2026

MANUCON · Industrial project partner

Ankara, Türkiye

Clear authority. Controlled delivery.

© 2026

MANUCON · Industrial project partner

Ankara, Türkiye

Clear authority. Controlled delivery.

© 2026